Taking into account the nature of the hydrologic system affecting Lake Skadar-Shkoder, the consultanti s expected to develop a predictive hydrological lake and lake basin model, with associated software, licenses, documentation, applications and training.
10 months from 01/11/2010 to 01/09/2011
General aims
The objective of this consultancy is to develop a predictive hydrological lake and lake basin model to analyze existing and expected impacts of development activities and proposals. The model will take into account the complexities of multiple sources of water and potential transport routes for pollutants into the lake, including the complex underlying karstic systems and the interconnections among the lake, its tributaries, and groundwater.
Expected results
The expected result of this activity is a developed predictive hydrological lake and lake basin model, with associated software, documentation, training, and applications to be used by the Lake Commission members’ staff and experts to define key impacts to the lake resulting from existing and proposed policies and infrastructure developments. Lake Commission members’ staff and consultants will be trained in the use of the model.
Activity
- Data collection
- Conceptual model development
- Software selection
- Progress report
- Model development
- Model calibration and validation
- Model testing
- Model documentation
- Draft final report and training
- Final report
Partners
- CMCC - Euro-Mediterranean Center on Climate Change
- SGI - Studio Galli Ingegneria SpA
- SEWA - South Environment and Weather Agency